InalgramIngeniería en Alimentos, Grasas y Emulsiones S.A.S
SERVICES · FEASIBILITY

Edible oil plant feasibility study for new and existing plants

An edible oil plant feasibility study from Inalgram looks at a refinery, fractionation or texturizing project from four sides before the investment decision, whether the plant is new or being re-engineered.

  • Financial and economic view of the project
  • Technical and environmental review
  • For start-up and for re-engineering

Why oil and fat plant projects need a feasibility study

Building or rebuilding a refinery, a fractionation unit or a texturizing line commits capital and shapes operations for years. Deciding on partial information is where most of the risk sits.

The numbers only tell half the story

A project can look attractive on a spreadsheet and still run into technical or environmental questions nobody asked early enough.

An existing plant no longer fits the plan

Products, volumes or markets have shifted, and it is unclear whether to adapt the current installation or rethink it.

Equipment choices feel premature

Teams are asked to pick equipment before the process, the economics and the site conditions have been looked at together.

What an edible oil plant feasibility study includes

The study combines financial, economic, technical and environmental analysis for edible oil and fat plants, covering refinery, fractionation and texturizing, for both new start-ups and the re-engineering of existing plants.

Financial and economic analysis

We examine the investment from a financial angle and place it in its wider economic context, so the decision rests on more than a single figure.

Technical analysis

We review the process and the plant and equipment it calls for, looking at how the parts fit together for the products you intend to make.

Environmental analysis

The environmental side of the project is assessed alongside the rest, so it informs the design instead of appearing late.

Refinery, fractionation and texturizing

The study can focus on any of these three stages, either for a plant that is starting up or for one being re-engineered.

How we approach a feasibility study

The work is organized in clear stages. Scope, depth and the form of the final report are set in the proposal.

01

Define the project

We clarify what you want to build or change, which stages are involved and what questions the study has to answer.

02

Analyze from every side

Our team works through the financial, economic, technical and environmental aspects and how they affect one another.

03

Present the findings

We share the results with your team and walk through them so you can take the next decision with a fuller picture.

Plant feasibility studies: common questions

Is the study only for new plants?
No. It applies to start-ups and to the re-engineering of plants that already operate. In both cases the same four angles are reviewed.
Which parts of a plant can it cover?
The study is aimed at edible oil and fat plants, specifically refinery, fractionation and texturizing. A project can include one of these stages or several.
Why include environmental analysis?
Because it affects design and viability as much as cost or process does. Looking at it from the start avoids surprises later in the project.
How is the scope decided?
We agree it with you after the first conversation about the project. The proposal sets out what the study will cover.

Other Inalgram services

Services

Margarine formula development

Complete margarine and fat blend formulas shaped to your manufacturing process, your market and your product goals.

See more
Services

Freight transport

Movement of liquid or solid goods to destinations across Colombia, coordinated through our commercial alliances.

See more

Weighing a plant investment?

Tell our technical team what you plan to build or change and we will outline a feasibility study that fits the decision ahead.

WhatsApp